Power Requirements at 43,765 MW by 2040

The Department of Energy said the country needs 43,765 MW of power supply by 2040. Luzon would need 24,385 MW, the Visayas 9,180 MW, and Mindanao 10,200 MW. On a per-technology basis, the country would need 25,265 MW of base-load power that can be sourced from coal, geothermal natural gas, nuclear, biomass and hydro for the said period. The additional mid-merit power sources that usually come from natural…

Subscribe via email for complete access to Supreme Consult’s weekly report on political and investment risks in the Philippines.

Advertisements